64V2488 Rehabilitation

Frame Repair

23 May 2001



Stripped the bad metal off the frame. Total of 4-5 feet. Mount plates removed for reconditioning




Starting to pin up .103 Cold rolled steel, 4" wide. Frame has contours, so where the turns are, the plate will be cut and refitted.




The spring mount plate was rusted through, so the bad spot was cut out



A new piece of the .103 CRS was cut and fitted. Not bad.....




Ready for dressing up and re-installation....


[ Main Page] [ Next Page ] [ Last Page ]