64V2488 Rehabilitation-

04 - 05 Apr 2001



Got the rear floor patched




The front piece is almost ready. Butt welding causes a lot of warping, so a bit of overlap is better.


Rear brace fitted and tacked. Lower rear pillar rebuild started



DS Box fitted again to check positioning of floor


[ Main ] [ Last ] [ Next ]