
64V2488 Rehabilitation-
04 - 05 Apr 2001
Got the rear floor patched

The front piece is almost ready. Butt welding causes a lot of warping, so a bit of overlap is better.

Rear brace fitted and tacked. Lower rear pillar rebuild started
DS Box fitted again to check positioning of floor